News Releases

Callinan to acquire Omenica property

August 28, 2005 Callinan Mines Limited has entered into an agreement with Mike Muzylowski, President of the company, under which the Company has been granted the option to acquire a 100% interest in two claims in the Omenica Mining Division of British Columbia. The claims cover an area of 1210 hectares and are located approximately … Continue reading “Callinan to acquire Omenica property”

Fox River Summary

May 3, 2005 Callinan Mines Limited (“the Company”) reports: The Company is pleased to report that sampling work on the Fox River Claims has confirmed the occurrence of kimberlite indicator minerals verifying historical assessment records from the government of Manitoba detailing results of previous sampling. Mineral Services of Vancouver has analyzed two samples of blue … Continue reading “Fox River Summary”

Callinan Winter Exploration Update

April 7, 2005 The Company’s exploration program on their Thompson Nickel Belt claims has been suspended temporarily. A total of eight drill holes have been completed, four each on the Pine Claim and the Phillips Lake claim. Ground and down hole geophysics were able to locate sizeable zones of conductivity on both properties. Drill testing … Continue reading “Callinan Winter Exploration Update”

Callinan Intercepts 215 ft of Mineralization in the Thompson Nickel Belt.

March 21, 2005 Earlier this month, Callinan retained Crone Geophysics of Mississauga, Ontario to interpret data from ground geophysics and down hole pulse EM surveys of hole CAS-2 on The Company’s Pine Property in Thompson, Manitoba. Crone Geophysics has indicated that the data suggests “a sizeable high conductance source… who’s minimum dimensions are likely on … Continue reading “Callinan Intercepts 215 ft of Mineralization in the Thompson Nickel Belt.”

Callinan Commits Initial Winter Exploration Program

November 10, 2004 Callinan Mines Limited Reports: Callinan has contracted and confirmed two drill rigs in preparation for this winter’s aggressive exploration program. Each of Callinan’s high potential Ni, Cu, PGM properties in Manitoba will be targeted. The first drill will be completing a program on the Cal Claim before moving on to the Pine … Continue reading “Callinan Commits Initial Winter Exploration Program”

Callinan advances exploration on Thompson properties

July 26, 2004 The Company reports: Recent nickel prices have been very favourable as the metal continues on a strong, bullish trend. In light of this, Callinan intends to advance exploration efforts on their recently acquired Pine and Phillips Lake claims in the Thompson Nickel Belt. Both claims are known to contain ultramafic host rocks … Continue reading “Callinan advances exploration on Thompson properties”

Callinan Closes Private Placement

January 6, 2004 Callinan Mines, effective Dec. 24, 2003, has closed the flow-through portion of its recently announced private placement of 727,800 flow-through shares at 65 cents per flow-through share and 160,000 units of the 460,000 unit private placement at 65 cents per unit. Each unit consists of one non-flow-through share and one-half of one … Continue reading “Callinan Closes Private Placement”

Callinan 1,187,800 FT and NFT Share Private Placement

December 19, 2003 The TSX Venture Exchange has accepted for filing documentation with respect to a non-brokered private placement announced Dec. 4, 2003: Shares: 1,187,800 shares (of which 727,800 are flow-through shares) Purchase price: 65 cents per share Warrants: 230,000 share purchase warrants to purchase 230,000 shares Warrant exercise price: 70 cents for a one-year … Continue reading “Callinan 1,187,800 FT and NFT Share Private Placement”